NCS-CORE practice question 33 of 35
A customer wants to know the details of network validation testing. Where can the consultant find this information?
Full set: 302 questionsThe Test Plan is the formal document created during the project planning phase that outlines the scope, objectives, methodology, and specific procedures for all validation activities. It provides detailed step-by-step instructions for tests, including network validation, and defines the expected outcomes and success criteria. This document serves as the primary reference for how testing will be conducted.
A. Handover checklist: This is a final verification list to ensure all project deliverables are complete; it confirms testing was done but lacks the procedural details.
C. Operations Guides: These documents provide instructions for the day-to-day management of the deployed system, not the initial validation testing procedures.
D. As-Built Guide: This guide documents the final configuration of the system as it was deployed, not the process or details of how it was tested.
1. Nutanix Services. (2021). Nutanix Services Delivery Kit (SDK) v3.1. The Test Plan deliverable is explicitly defined as the document containing "the test cases that will be used to validate the solution." (Section: Project Deliverables).
2. Nutanix University. (2023). Nutanix Hybrid Cloud Fundamentals Courseware. Module on "Nutanix Implementation Process" describes the Test Plan as the document detailing validation steps for the environment, including network configuration.
Keep practicing
Take the free NCS-CORE practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other NCS-CORE practice questions
- Question 1In a 20-node ESXi deployment, the customer needs additional resiliency to survive the los…
- Question 2A consultant is planning a new cluster installation and needs to locate the Shared IPMI p…
- Question 3Which configuration item is a hard requirement to deploy a Nutanix cluster?
- Question 4A customer is running out of storage in an ESXi cluster. The customer wants to add storag…
- Question 5A consultant configures a Nutanix cluster and integrates the hosts into vCenter using VMw…