NCS-CORE practice question 32 of 35
An administrator is supporting a business critical environment and deploys metro availability to achieve a zero data loss configuration. The two…
Full set: 302 questionsMetro Availability provides a zero Recovery Point Objective (RPO=0) by using synchronous replication. This means every write I/O must be successfully written to both the primary and secondary sites before being acknowledged. The inter-cluster network link must therefore support the peak write I/O of the protected workloads. The new workload requires 150 MB/s (MegaBytes per second). A 1 GbE link has a theoretical maximum throughput of 125 MB/s (1 Gigabit/sec ÷ 8 bits/Byte = 125 MegaBytes/sec). Since the required write throughput (150 MB/s) exceeds the available network bandwidth (125 MB/s), the bandwidth must be increased.
The workload must be configured to read at greater than 12.5MB/S.: Read I/O is served locally and is not replicated over the Metro link, so read throughput is irrelevant to the bandwidth requirement for replication. The replication frequency must be less than 60 minutes.: Replication frequency is a setting for asynchronous (non-zero RPO) protection domains, not for the continuous synchronous replication used by Metro Availability. Zero data loss nearsync must be used to support this workload.: Nearsync provides a low RPO (minutes), but it is not an RPO of zero. The requirement is to maintain the existing zero data loss configuration.
1. Nutanix. (2023). Data Protection and Recovery with Prism Element Guide v6.7. Chapter: "Metro Availability (ESXi and AHV)". Section: "Metro Availability Requirements and Limitations". This section specifies network requirements, including bandwidth sufficient for peak writes and latency constraints.
2. Nutanix University. (2023). Nutanix Data Protection and Disaster Recovery (NDPDR). Module: "Business Continuity with Metro Availability". The courseware details that synchronous replication performance is directly gated by the inter-site network bandwidth and latency.
Keep practicing
Take the free NCS-CORE practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other NCS-CORE practice questions
- Question 1In a 20-node ESXi deployment, the customer needs additional resiliency to survive the los…
- Question 2A consultant is planning a new cluster installation and needs to locate the Shared IPMI p…
- Question 3Which configuration item is a hard requirement to deploy a Nutanix cluster?
- Question 4A customer is running out of storage in an ESXi cluster. The customer wants to add storag…
- Question 5A consultant configures a Nutanix cluster and integrates the hosts into vCenter using VMw…
- Question 6An administrator wants to utilize Network Visualization to monitor the physical and logic…
