NCSC-LEVEL-1 practice question 13 of 15

A customer has a G6 AHV cluster with 4x10GbE NICs on each node and the following configuration: * Networking is set to default * Only two NICs are connected The customer receives the following critical message: The NIC is disconnected from the switch, or the switchport is failing. What should the consultant verify to resolve the issue?

Full set: 78 questions
Answer options
A: The NICs are configured for active-backup. Correct answer
B: The VLANs are configured correctly on the switch or tagged on the cluster.
C: The other two 10GbE connections are removed from the default bond.
D: The NICs are connected for balance-slb.
Correct Answer:
A. The NICs are configured for active-backup.
Scroll to Top