SAFE-AGILIST practice question 1 of 15
Which statement is true about batch size?
Full set: 87 questionsAccording to the principles of product development flow, large batch sizes are a primary cause of delays and inefficiencies. They increase the variability and risk in the development process, making outcomes less predictable. Large batches lead to longer cycle times, delayed feedback, and a higher likelihood of extensive rework. Conversely, small batches enable faster flow, quicker feedback, and lower variability, which are core tenets of Lean-Agile development and SAFe Principle #6.
A. Handoff batches should be made as small as possible to reduce delays and improve the flow of value.
B. Large batch sizes delay feedback, which is antithetical to Built-In Quality practices that rely on fast feedback loops.
D. Breaking Stories into tasks is a planning technique; it does not inherently define the batch size of value flowing through the system.
1. Scaled Agile, Inc. (2023). "SAFe Principle #6 – Make value flow without interruptions". Scaled Agile Framework. Retrieved from https://www.scaledagileframework.com/make-value-flow-without-interruptions/. (See section: "Address the challenges with flow," specifically the sub-section on reducing batch sizes).
2. Reinertsen, D. G. (2009). The Principles of Product Development Flow: Second Generation Lean Product Development. Celeritas Publishing. (Chapter 4, "The Economics of Batch Size," explains how large batches increase variability).
Keep practicing
Take the free SAFE-AGILIST practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other SAFE-AGILIST practice questions
- Question 2What is the focus of Lean Thinking?
- Question 3Which basic Agile quality practice reduces bottlenecks and ensures consistency?
- Question 4What is one of the tools associated with Design Thinking?
- Question 5What is one of the Agile Release Train events?
- Question 6What is one way to describe a cross-functional Agile Team?
- Question 7Who decides the Team PI Objective Business Value scoring after negotiation?