TM12 practice question 9 of 15
You are performing a quality risk analysis for a CSCI (Computer Software Configuration Item) used to implement a CBIT (Continuous Built-In Test)…
Full set: 65 questionsThe process described is a textbook application of Failure Mode and Effect Analysis (FMEA). This technique systematically identifies potential "failure modes" (ways a system can fail), analyzes their "effects," and determines their root "causes." A key component of FMEA is the calculation of a Risk Priority Number (RPN) to prioritize risks. The question explicitly states this calculation as the product of three factors: severity, occurrence (likelihood), and detection. This structured, bottom-up approach is characteristic of FMEA and is widely used for risk analysis in safety-critical systems, as described in the scenario.
A. The described method is a formal and structured technique (FMEA), not a generic or informal "lightweight" approach.
C. Wide Band Delphi is an expert-based estimation technique for forecasting, not a method for analyzing system failure modes.
D. Cost of Exposure calculates risk as the product of failure probability and cost, not the three-factor (S x O x D) model described.
1. Teoh, P. C., & Case, K. (2004). Failure modes and effects analysis through knowledge modelling. Journal of Materials Processing Technology, 153-154, 253-260. (See Section 2, "Failure Modes and Effects Analysis," which describes the RPN calculation as Severity × Occurrence × Detection). https://doi.org/10.1016/j.jmatprotec.2004.04.258
2. University of Washington, Department of Mechanical Engineering. (n.d.). ME 395: Introduction to Mechanical Design - Failure Modes and Effects Analysis (FMEA). Courseware. (See slides 5-10, which detail the FMEA process and define the Risk Priority Number (RPN) as the product of Severity (S), Occurrence (O), and Detection (D)).
3. Stamatis, D. H. (2003). Failure Mode and Effect Analysis: FMEA from Theory to Execution (2nd ed.). ASQ Quality Press. (See Chapter 4, "The FMEA Process," which details the calculation of the RPN from Severity, Occurrence, and Detection ratings).
Keep practicing
Take the free TM12 practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other TM12 practice questions
- Question 2Which of the following would you expect to be most likely an example of a demotivating fa…
- Question 3Which of the following statements describing the consequences of specifying test conditio…
- Question 7The main objectives the senior management team wants to achieve are: - to reduce the cost…
- Question 8After a selection process you have selected a test management tool that is going be intro…
- Question 10You are a Test Manager working for a software organization where reviews have never been …
- Question 11Assume you have some data related to confirmation testing during system testing of a past…
