1Z0-1057-26 practice question 23 of 25
Your client is involved in automation control systems installation. Over the years, they have analyzed their total project spend on specific resource classes. They have identified that their cost spread distribution factor on a 10 spread point scale resembles: 0-4-10-11-14-13-10-4-0-0. Identify two ways to handle this kind of a spread on their budgets and forecasts. (Choose two)
Full set: 126 questionsThe organisation can (1) build an exact custom spread curve and assign it to the relevant resource class so every budget or forecast that uses that class automatically follows the desired pattern, or (2) simply apply the delivered Bell Curve, whose symmetrical shape is very close to the required distribution and can be fine-tuned with minimal manual adjustments.
A. Attaching the custom curve only to a project template limits use to projects created from that template, not every occurrence of the resource class studied.
D. The predefined S-Curve is front-loaded then tapers; it doesn’t match the symmetric 0-4-10-…-4-0 profile.
1. Oracle Fusion Cloud Project Management 24B
Implementing Project Control
“Manage Planning and Control Spread Curves”
Table 5-9 “Assign a spread curve to a resource class”
pp. 74-75.
2. Same guide
Table 5-8 “Predefined spread curves – Bell Curve”
p. 72.
Keep practicing
Take the free 1Z0-1057-26 practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other 1Z0-1057-26 practice questions
- Question 1While creating a new project template, you notice that a default Asset Cost Allocation me…
- Question 2Your customer wants to calculate Estimate to Complete (ETC) as the difference between Cur…
- Question 3Which step within the functional setup manager helps you to move your verified setup data…
- Question 4Which three Cost Collection Flexfield core attributes can be derived during import if not…
- Question 5You have been asked to set up one active person, who is not a team member in the project,…
- Question 6Your customer wants a team member who is assigned to a project to be able to create and s…