AD0-E406 practice question 4 of 15

To create a 12-month road map, a Adobe Target Business Practitioner (BP) needs to estimate test durations for upcoming activities. One selected…

Full set: 68 questions
To create a 12-month road map, a Adobe Target Business Practitioner (BP) needs to estimate test durations for upcoming activities. One selected activity includes the following information: • A/B Test • Two experiences Estimated daily traffic (visitors): 5.000 • Level of significance to constitute a win: 99% • Minimum detectable lift: 3% The 8P is using the Adobe Sample Size Calculator and wants to reduce the projected run time. Which two methods should be used to accomplish this task? (Choose two.)
Answer options
A: Adjust the audience to include 3.500 visitors per day.
B: Change the number of experiences to 3. Correct answer
C: Change the level of significance required to constitute a win to 95%. Correct answer
D: Change the minimum detectable lift to 5%.
Correct Answer:
B. Change the number of experiences to 3.; C. Change the level of significance required to constitute a win to 95%.
Explanation

:

Scroll to Top