What is a good reason to get the facilities engineers involved early in the planning of a new building design or major renovation?

Full set: 251 questions
Answer options
A: To create operational and energy usage benchmarks at the beginning of the project
B: To ensure that the as-built drawings are accurate
C: To ensure that the design optimizes the operations and maintenance of the proposed building systems Correct answer
D: To ensure that all punch list items have been adequately addressed
Correct Answer:
C. To ensure that the design optimizes the operations and maintenance of the proposed building systems
Explanation

Involving facilities engineers early in the planning and design phase is a core principle of life-cycle asset management. Their primary contribution is to provide an operational perspective, ensuring that the design optimizes the long-term operations and maintenance (O&M) of building systems. This practice, known as "Design for Maintainability," addresses critical factors like equipment accessibility, durability of materials, and efficiency of systems. Early input prevents designs that may be aesthetically pleasing or have a low initial cost but result in high long-term operational expenses, difficult maintenance procedures, and premature system failure. This proactive involvement is the most effective way to reduce the total cost of ownership.

Why Incorrect

A. While facilities engineers help establish realistic operational and energy benchmarks, this is a result of an optimized design, not the primary reason for their involvement.
B. As-built drawings are verified and finalized at the end of a project during the closeout phase, not during early planning.
D. The punch list is created and managed during the final stages of construction and commissioning, just before handover, not in the initial design phase. ---

References

1. Roper

K. O.

& Payant

R. P. (2014). The Facility Management Handbook (4th ed.). AMACOM.

Chapter 11

"Facility Project Management

" Section: "The Design Phase." This chapter emphasizes the facility manager's critical role in the design phase to ensure that operational needs are met. It states

"The facility manager brings the perspective of the end user and the operations and maintenance staff to the design process... Input on maintainability of equipment and finishes can save thousands of dollars over the life of the building." (Paraphrased from concepts on pp. 229-231).

2. El-Haram

M. A.

& Agapiou

A. (2002). The role of the facility manager in the design process. Facilities

20(5/6)

189-197.

Abstract & Section: "FM involvement in the design process." The paper argues that the early involvement of facility managers is crucial for integrating O&M knowledge into the design. It concludes

"The involvement of the FM in the early stages of the design process can lead to a significant improvement in the design of the building in terms of its functionality

maintainability and operational efficiency." (p. 195). DOI: https://doi.org/10.1108/02632770210427008

3. National Institute of Building Sciences. (2015). Whole Building Design Guide (WBDG)

Engage the Integrated Design Process.

Section: "Include All Stakeholders." The guide specifies that operations and maintenance personnel are key stakeholders who must be involved from the earliest stages of design. Their input is cited as essential for "ensuring building performance and optimal operations" and providing "valuable information on the durability

maintainability

and life-cycle costs of building systems and materials."