Which of the following outcomes is a benefit of mixed-model scheduling?
Full set: 151 questionsMixed-model scheduling is a production technique that allows for the simultaneous production of different products or features on the same production line or system. Mixed-model scheduling can help reduce lead times, inventory levels, setup times, and material shortages by increasing the flexibility and responsiveness of the production process. One of the benefits of mixed-model scheduling is improved demand response, which means the ability to meet customer demand without delay or stockout. Improved demand response can enhance customer satisfaction and loyalty, as well as reduce the need for safety stock or buffer inventory. By using mixed-model scheduling, a company can produce products or features according to the actual or forecasted customer demand, rather than producing large batches of standardized products or features. This can help avoid overproduction or underproduction, which can result in excess inventory or lost sales. Mixed-model scheduling can also help adjust the production output quickly and easily when there are changes or fluctuations in demand, by using flexible automation, lean production techniques, or quick response methods. The other options are not benefits of mixed-model scheduling. Increased inventory is not a benefit of mixed-model scheduling, but rather a drawback. Increased inventory can increase inventory costs, such as holding costs, transportation costs, or obsolescence costs. It can also reduce inventory visibility and control, as well as increase the risk of quality issues or spoilage. Mixed-model scheduling can help reduce inventory by producing products or features in small batches or single units that match customer demand. Fewer setups are not a benefit of mixed-model scheduling, but rather a requirement. Fewer setups mean less time and resources spent on changing or adjusting the production system to produce different products or features. Fewer setups can increase the efficiency and productivity of the production process, as well as reduce the setup costs and waste. Mixed-model scheduling requires fewer setups to enable the simultaneous production of different products or features on the same production line or system. Fewer material shortages are not a benefit of mixed-model scheduling, but rather an outcome. Fewer material shortages mean less disruption or delay in the production process due to the lack of materials or components needed for production. Fewer material shortages can improve the quality and reliability of the production process, as well as reduce the material costs and waste. Mixed-model scheduling can result in fewer material shortages by reducing the lead times and inventory levels of materials or components, as well as by improving the communication and coordination with suppliers. Reference := Mixed Model Scheduling - Mountain Home Academy, Reduce Lot Sizes, Mixed Model
Scheduling - Academic library, Introduction To Mixed Model Production …{Strategos}
Keep practicing
Take the free CPIM-PART-2 practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other CPIM-PART-2 practice questions
- Question 1In a lean environment, one uses material requirements planning (MRP) processing primarily…
- Question 2Up-to-date information about production order status is required to do which of the follo…
- Question 3The results from responding to uncertainty in the supply chain by exaggerating lead times…
- Question 4The capacity requirements plan is used primarily to:
- Question 6Which of the following tools is used to evaluate the impact that a production plan has on…
- Question 7The demonstrated capacity of equipment in a process flow is $1,200 per day. Due to a malf…