CWNA-109 practice question 5 of 25
What is always required to establish a high quality 2.4 GHz RF link at a distance of 3 miles (5 kilometers)?
Full set: 122 questionsFor any long-distance Radio Frequency (RF) link, a clear Line of Sight (LoS) is fundamental for quality and reliability. This includes not just the visual path but also the area surrounding it known as the Fresnel Zone. The first Fresnel Zone contains the most significant portion of the transmitted RF energy. Obstructions within this zone can cause the signal to reflect, diffract, or be absorbed, leading to signal cancellation (multipath) and significant degradation of the link performance. Industry best practice, as emphasized in CWNA training, dictates that for a reliable link, at least 60% of the first Fresnel Zone must be free of obstructions, with 80% or more being ideal. This is a fundamental principle of RF propagation that cannot be reliably compensated for by simply increasing power or antenna gain.
A. Minimum output power level of 2 W: The required output power is determined by a link budget calculation, which balances power, antenna gain, distance, and receiver sensitivity. A link could be established with less power if higher gain antennas are used.
B. Grid antennas at each endpoint: While grid antennas are a type of high-gain directional antenna suitable for this purpose, other types, such as parabolic dish or Yagi antennas, could also be used to achieve the necessary performance.
C. A minimum antenna gain of 11 dBi at both endpoints: The required antenna gain is variable and depends on the link budget. One could use lower-gain antennas if the transmitter output power is increased (within regulatory limits), or vice-versa.
1. Coleman, D. D., & Westcott, D. A. (2023). CWNA Certified Wireless Network Administrator Study Guide: Exam CWNA-109 (6th ed.). Sybex.
Page 109, Chapter 3: Radio Frequency (RF) Fundamentals: "For optimal performance, you want the Fresnel zone to be at least 80 percent clear of any obstructions. A link may still work if the Fresnel zone is 60 percent clear, but any obstruction greater than 40 percent will likely degrade the signal and the performance of the link." This directly supports the 60% clearance rule as a minimum requirement.
2. Cisco. (2019). Outdoor Bridge and Mesh Design Guide.
Section: Site Survey, Subsection: Line-of-Sight and Fresnel Zone Considerations: This guide emphasizes that a primary requirement for a successful outdoor wireless bridge is a clear line-of-sight (LOS) path, which includes ensuring the Fresnel Zone is free from obstructions. It states, "For best performance, the Fresnel Zone should be at least 60% clear of any obstacles."
3. Zuniga, J. C., & Njedjou, E. (2014). Fundamentals of Wireless Communication Engineering Technologies. John Wiley & Sons.
Chapter 2, Section 2.4.3: Fresnel Zones: This academic text explains the physics of the Fresnel Zone, stating, "For a good quality of communication link, it is recommended that the first Fresnel zone is kept free of obstacles. However, if it is not possible, a clearance of at least 60% of the first Fresnel zone is acceptable."
Keep practicing
Take the free CWNA-109 practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other CWNA-109 practice questions
- Question 1You manage a WLAN with 100 802.11ac access points. All access points are configured to us…
- Question 2You have implemented an 802.11ax WLAN for a customer. All APs are four stream HE APs. The…
- Question 3You are the network administrator for ABC Company. Your manager has recently attended a w…
- Question 4The BSA of an AP covers the area used by the sales and marketing department. Thirty-five …
- Question 6You are troubleshooting a problem with interference from a non-802.11 device. Given that …
- Question 7You are implementing a VHT-capable AP. Which one of the following channels is available i…