Why must changes to critical infrastructure follow a formal change-management process?
Full set: 162 questionsCritical data center infrastructure supports continuous uptime, making unscheduled disruptions unacceptable. A formal change-management process ensures that any proposed modification to power, cooling, or connectivity is thoroughly evaluated for potential operational risks. It mandates cross-functional coordination among stakeholders, requires explicit management authorization before execution, enforces testing procedures, and preserves accurate baseline configuration records. This structured approach prevents human error, minimizes service interruptions, and maintains facility documentation integrity.
B. Formal change management coordinates work centrally rather than allowing technicians to make unapproved, independent changes.
C. Change management enables controlled, safe facility improvements rather than preventing infrastructure enhancement.
D. Formal change management mandates rigorous pre-implementation testing and rollback planning rather than avoiding testing.
- ANSI/BICSI 002-2019, Data Center Design and Implementation Best Practices, Section 17.5 (Change Management).
- ITIL v4 Foundation Publication, Section 5.2.4 (Change Enablement Practice).
- ISO/IEC 20000-1:2018, Information technology — Service management, Section 8.5.6 (Control of changes).
Keep practicing
Take the free DCDC-004 practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other DCDC-004 practice questions
- Question 1What does mechanical-system redundancy protect against?
- Question 2What is the purpose of structured cabling?
- Question 3What is the purpose of electrical grounding and bonding?
- Question 5How should future expansion space be protected in the layout?
- Question 6Why should planning assumptions be documented?
- Question 7How should a discovered nonconforming installation be handled?