ICYB practice question 23 of 25

As we begin to describe the things occurring with our process through a Process Map we begin to see some steps that are NVA which stands for ____________.

Full set: 120 questions
Answer options
A: Non-value add Correct answer
B: No violation allowed
C: Non-value actions
D: Next vehicle action
Correct Answer:
A. Non-value add
Explanation

In the context of Lean Six Sigma and process mapping, NVA is the standard acronym for Non-Value-Add. These are steps or activities within a process that consume resources but do not add any value from the customer's perspective. The customer is not willing to pay for these activities. A primary objective of process analysis, such as creating a process map or value stream map, is to identify NVA steps (also known as waste or Muda) and target them for elimination to improve efficiency, reduce costs, and increase the velocity of the process.

Why Incorrect

B. No violation allowed: This phrase relates to compliance or safety regulations, not the principles of value analysis in Lean process improvement.
C. Non-value actions: While semantically similar, "Non-value add" is the formally recognized and universally accepted term within the IASSC body of knowledge and Lean methodologies.
D. Next vehicle action: This is not a standard term in process improvement methodologies and is irrelevant to the context of value analysis.

References

1. Hines, P., & Rich, N. (1997). The seven value stream mapping tools. International Journal of Operations & Production Management, 17(1), 46-64. In Table I on page 53, activities are classified, and NVA is explicitly defined as "Non-value-adding (NVA) – actions which should be eliminated". DOI: https://doi.org/10.1108/01443579710157989

2. The Ohio State University, Fisher College of Business. (n.d.). Process Improvement & Lean Six Sigma: A Pocket Guide. Center for Operational Excellence. In the glossary on page 11, Non-Value Added (NVA) is defined as: "Any activity that does not add form, feature or function to the product. NVA activities are pure waste."

3. Melton, T. (2005). The benefits of lean manufacturing: What lean is and what it is not. Journal of Engineering and Technology Management, 22(4), 319-330. The paper discusses the core Lean concept of identifying and eliminating waste, defining non-value-added activities as "work that adds no value to the product or service in the eyes of the customer" (p. 321). DOI: https://doi.org/10.1016/j.jengtecman.2005.08.002

Scroll to Top