L4M2 practice question 3 of 30
Which of the following problems may be identified as open-ended problems? Select TWO that apply:
Full set: 301 questionsOpen-ended problems, often referred to as ill-structured or 'wicked' problems, are complex issues that lack a clear, single solution. They typically involve multiple stakeholders, conflicting objectives, and require a strategic, multi-faceted approach rather than a straightforward technical fix. Logistics costs (D) represent a strategic challenge with numerous potential solutions (e.g., network redesign, mode of transport changes, supplier collaboration), none of which is singularly "correct." Similarly, supplier non-compliance with ethical policies (E) is a complex issue involving corporate social responsibility, legal risk, and brand reputation, requiring a nuanced strategy that could range from supplier development to divestment. Both scenarios fit the definition of an open-ended problem.
A. Shortage of key medicines is a critical supply chain disruption, but the problem is well-defined (a specific shortage) with a clear goal (restore supply), making it a more closed-ended problem.
B. A cyber attack is a technical crisis. While severe, it is a well-defined problem with a clear, immediate objective: restore and secure the IT systems.
C. Engine failures are specific technical and safety problems. The resolution path, involving investigation, repair, and preventative maintenance, is structured and procedural, not open-ended.
1. CIPS (Chartered Institute of Procurement & Supply). (2018). L4M2: Defining Business Need. Profex Publishing. In discussions on problem-solving, the guide distinguishes between operational, well-defined problems and strategic, ill-structured problems. Issues like strategic cost management (D) and ethical compliance (E) are presented as complex, open-ended challenges requiring comprehensive analysis and creative solutions, unlike technical failures (B, C) which have more direct solution paths. (Specific reference typically found in modules covering specification development and stakeholder management).
2. Jonassen, D. H. (2000). "Toward a Design Theory of Problem Solving". Educational Technology Research and Development, 48(4), 63–85. https://doi.org/10.1007/BF02300500. This academic paper defines ill-structured (open-ended) problems as having "unclear goals and incomplete information" and possessing "multiple solutions, solution paths, or no solutions at all" (p. 68). The challenges in options D and E align perfectly with this definition, whereas A, B, and C represent more well-structured problems with clearer goals and solution parameters.
3. Lysons, K., & Farrington, B. (2020). Procurement and Supply Chain Management (10th ed.). Pearson. Chapter 15, "Ethical and Sustainable Procurement," discusses the complexity of issues like child labour (relevant to option E), framing them as multifaceted problems requiring ongoing management, audits, and strategic decisions rather than a single, simple fix. This aligns with the nature of open-ended problems.
Keep practicing
Take the free L4M2 practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other L4M2 practice questions
- Question 1An IT category buyer wishes to include social and environmental criteria within a supplie…
- Question 2Which of the following are typical environmental considerations throughout the contract l…
- Question 4Which of the following is the core of value analysis process?
- Question 5Which of the following statements is true about product life cycle?
- Question 6A procurement manager consolidates the company expense on printing and office supplies in…
- Question 7A procurement manager is writing a conformance specification for a non-core component. Sh…