Which of the following strategies would be considered an acceptable minor improvement within the wetland buffer for Location and Transportation Credit, Sensitive Land Protection?
Full set: 305 questionsLEED v4 BD+C Location & Transportation credit “Sensitive Land Protection” allows only “minor improvements” within wetlands/water-body buffers—e.g., a single‐lane vehicle access drive ≤16 ft (5 m) wide—provided it impacts less than 10% of the buffer and is restored afterward.
A. New two-story buildings exceed the “minor improvement” allowance and disturb protected land.
B. Regrading for fencing is specifically excluded; security fences must follow existing contours.
D. Tree removal under 6-in. DBH is not listed among permitted activities; vegetative buffer is to remain intact.
1. USGBC. LEED v4 BD+C Reference Guide, LT-c3 Sensitive Land Protection, “Wetlands & Water Bodies—Minor Improvements,” p. 93.
2. USGBC. LEED v4 BD+C v4 Addenda (Apr-2019), Interpretation #10440, clarifying 5 m drive width limit.
Keep practicing
Take the free LEED-AP-BDC practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other LEED-AP-BDC practice questions
- Question 1When required to measure residential and non-residential densities, Location and Transpor…
- Question 2A design team is working on a hospital project. In order to meet the Energy and Atmospher…
- Question 3For Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan,…
- Question 4What LEED Building Design and Construction rating system mandates a preliminary LEED meet…
- Question 6Which of the following sinks is classified as a private lavatory faucet under Water Effic…
- Question 7What type of project would benefit from showing compliance with Energy and Atmosphere Pre…