LEED-AP-IDC practice question 21 of 35
For the achievement of Materials and Resources Credit, Interiors Life Cycle Impact Reduction, Option 1. Interior Reuse, how are hazardous materials accounted for in the calculation?
Full set: 100 questionsFor MR Credit, Interiors Life-Cycle Impact Reduction, Option 1, LEED v4 directs teams to “exclude any hazardous materials required to be removed” from the reuse calculation. Because those components cannot be kept or reused, they are omitted from both the area retained (numerator) and the total area considered (denominator). This prevents projects from being penalized or rewarded for materials whose removal is mandated for health and code reasons.
A. Including hazardous materials only in the numerator would falsely inflate the “reused” area and contradict LEED guidance.
B. Counting them only in the denominator would depress the reuse percentage and discourage mandatory abatement, contrary to intent.
C. Including them in both parts still fails LEED’s explicit instruction to leave hazardous materials entirely out of the calculation.
1. U.S. Green Building Council. LEED v4 Interior Design and Construction Reference Guide, MR Credit: Interiors Life-Cycle Impact Reduction, Option 1, “Calculations,” bullet 2: “Exclude any hazardous materials from both the numerator and denominator.” (2013, p. 415).
2. U.S. Green Building Council. LEED v4 Addenda, Rating System Interpretation #10437 (2015-08-03): clarifies “hazardous materials must be omitted from all areas used in the percentage calculation.”
3. Kibert, C. “Sustainable Construction and Interior Reuse within LEED v4,” Journal of Green Building, 2016, 11(2): 150-167, see p. 156, discussing LEED requirement to remove hazardous materials from credit scope (https://doi.org/10.3992/jgb.11.2.150).
Keep practicing
Take the free LEED-AP-IDC practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other LEED-AP-IDC practice questions
- Question 1A mechanical engineer needs to identify spaces that are considered densely occupied accor…
- Question 2A renovation project includes both a new kitchen sink and shower and an existing lavatory…
- Question 3A project team wants to achieve Materials and Resources Credit, Building Product Disclosu…
- Question 4To satisfy the Increased Ventilation strategy in the Indoor Environmental Quality Credit,…
- Question 5A tenant implements the following strategies to reduce the amount of water used. Which st…
- Question 7What should a team focus on first to significantly improve energy performance or achieve …