NCP-BC practice question 10 of 25
A VM is protected in an Async Protection Policy and added to a Recovery Plan. An administrator is attempting to perform a planned failover of the VM. How many recovery points are created and replicated during the planned failover process?
Full set: 109 questionsDuring a planned failover, the system's objective is to achieve zero data loss (RPO=0). To accomplish this, Nutanix Disaster Recovery first gracefully powers off the guest VM at the source location. After the VM is powered off, it takes one final, consistent recovery point (snapshot), replicates it to the recovery location, and then powers on the VM at the recovery site using this newly replicated data. This ensures all in-flight data is captured.
A. This is incorrect. A new recovery point is always created during a planned failover to ensure zero data loss. Using the last replicated point is characteristic of an unplanned failover.
B. The recovery point is taken after the VM is powered off to ensure a consistent state, not while it is powered on.
C. The process is optimized to take only one final, consistent recovery point after the VM is powered off, not two separate ones.
1. Nutanix Disaster Recovery Guide v6.0, Chapter: Protection and Recovery with Nutanix Disaster Recovery, Section: Planned Failover. "When you initiate a planned failover... The system powers off the guest VMs gracefully at the source location... The system takes a new recovery point of the entities, replicates it to the recovery location..."
2. Nutanix University, Nutanix Certified Professional - Business Continuity (NCP-BC) 6.5, Module 4: Disaster Recovery Runbooks, Lesson: Recovery Plan Workflows. The courseware describes the planned failover process as shutting down the source VM before taking and replicating a final snapshot.
Keep practicing
Take the free NCP-BC practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other NCP-BC practice questions
- Question 1When designing a Disaster Recovery strategy to an NC2 cluster using MST, which technical …
- Question 2An organization uses Nutanix Disaster Recovery with automatic virtual network creation in…
- Question 3An administrator configures disaster recovery between an on-premises AZ and a Nutanix Clo…
- Question 4An administrator needs to provide leadership with a report showing the timeframe of each …
- Question 5After a failover and stabilization of workloads at the recovery AZ, an administrator remo…
- Question 6An administrator executes an Unplanned Failover of web server VMs from an on-premises AZ …
