NCP-BC practice question 11 of 25
An administrator is tasked with verifying the cluster's disaster recovery capability. The administrator needs to validate the capability without impacting the production VMs on the Source cluster and ensure that the destination cluster can bring up all the protected VMs. How can the administrator perform a failover?
Full set: 109 questionsA test failover is the specific feature designed to validate a disaster recovery plan without any impact on the production environment. When a test failover is initiated, the recovery plan brings up the protected VMs on the destination cluster using the replicated snapshots. These test VMs are created in an isolated network bubble, preventing any conflict with the production VMs, which continue to run uninterrupted at the source cluster. This allows the administrator to perform a full validation of the DR process, including VM boot-up and application functionality, in a safe, non-disruptive manner.
A. Validating a Recovery Plan is only a configuration check. It verifies syntax and entity existence but does not power on any VMs or test the actual recovery process.
B. An unplanned failover is a real disaster recovery invocation, used when the source site is offline. It is disruptive and intended for actual emergencies, not for testing.
D. A planned failover is a controlled migration from the source to the destination site. It involves gracefully shutting down production VMs, making it a disruptive, production-impacting event.
1. Nutanix Leap Administration Guide (dr-2023.3), "Recovery Plan Workflows", Section: "Testing a Recovery Plan". The documentation explicitly states: "You can test a recovery plan without impacting your production environment... The test VMs power-on in the selected test network at the recovery AZ."
2. Nutanix University, "Nutanix Data Protection and Disaster Recovery (NDPDR) 6.5", Module 4: "Disaster Recovery with Prism Central". The courseware describes test failover as the primary method for non-disruptive DR drills, contrasting it with the production-impacting planned and unplanned failovers.
Keep practicing
Take the free NCP-BC practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other NCP-BC practice questions
- Question 1When designing a Disaster Recovery strategy to an NC2 cluster using MST, which technical …
- Question 2An organization uses Nutanix Disaster Recovery with automatic virtual network creation in…
- Question 3An administrator configures disaster recovery between an on-premises AZ and a Nutanix Clo…
- Question 4An administrator needs to provide leadership with a report showing the timeframe of each …
- Question 5After a failover and stabilization of workloads at the recovery AZ, an administrator remo…
- Question 6An administrator executes an Unplanned Failover of web server VMs from an on-premises AZ …
