NCP-BC practice question 12 of 25
An administrator needs to perform a test failover on a Recovery Plan. What is the primary goal of this action?
Full set: 109 questionsA test failover is a non-disruptive operation designed to validate a recovery plan's configuration. It brings up copies of the protected VMs in a sandboxed network at the recovery site using existing replicated snapshots. This process verifies that VMs can be recovered and that network mappings are correct without affecting the running production workloads at the primary site. The primary goal is to ensure recoverability and readiness for a real disaster scenario.
A. Copying data is part of the ongoing replication process defined by the protection policy, not the primary goal of the test failover action itself, which uses already-replicated data.
B. This describes a planned or unplanned failover, which is a production-impacting event that moves workloads, not a non-disruptive test.
D. Disabling replication is a separate administrative task, typically done for maintenance, and is not a goal or part of a test failover.
1. Nutanix University, Nutanix Certified Professional - Business Continuity (NCP-BC) 6.5, Module 4: Disaster Recovery Runbooks, Lesson: Recovery Plan Workflows.
2. Nutanix Disaster Recovery Guide v6.0, Chapter: Recovery Plan Management, Section: Performing a Test Failover. "You can perform a test failover to validate a recovery plan. A test failover is a non-disruptive test. It does not impact the primary site."
Keep practicing
Take the free NCP-BC practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other NCP-BC practice questions
- Question 1When designing a Disaster Recovery strategy to an NC2 cluster using MST, which technical …
- Question 2An organization uses Nutanix Disaster Recovery with automatic virtual network creation in…
- Question 3An administrator configures disaster recovery between an on-premises AZ and a Nutanix Clo…
- Question 4An administrator needs to provide leadership with a report showing the timeframe of each …
- Question 5After a failover and stabilization of workloads at the recovery AZ, an administrator remo…
- Question 6An administrator executes an Unplanned Failover of web server VMs from an on-premises AZ …