An elementary school requires a renovation, selective demolition, and a major addition in order to accommodate a growing student population. An…
Choose your answer, then check it against the explanation.
An elementary school requires a renovation, selective demolition, and a major addition in order to
accommodate a growing student population. An architectural firm has prepared schematic design
plans incorporating the school's increased programmatic needs, including an enlarged library,
cafeteria, and gymnasium; a secure courtyard; and additional space for administrative offices and
classrooms. The main entrance was relocated in order to improve the traffic and pedestrian flow at
the beginning and end of the school day, and additional parking was provided to comply with current
zoning requirements.
The existing single-story masonry building was built in 1950. Two small additions were built later: the
north addition will be kept and repurposed, but the south addition will be demolished. The building
contains asbestos and lead in roof soffits, floor tiles, pipe insulation, and window paint. All existing
mechanical systems need to be replaced; new systems have not been selected.
Considerations for the renovation include:
•
The relocated front entrance must be easily recognizable, highly visible, and secure.
•
Interior and exterior materials need to be durable and maintainable in order to withstand
frequent student abuse, but also economical due to strict budget limitations.
•
Good indoor air quality and increased energy efficiency are priorities for the selection of
mechanical equipment.
After completion, the entire school should look uniform, without a distinctive difference between
the existing building and new addition.
Building information:
•
Construction Type is II-B.
The following resources are available for your reference:
•
Existing Plans, including site and floor plans
•
Proposed Plans, including site and floor plans
•
Cost Analysis
•
Zoning Ordinance Excerpts, for off-street parking requirements
•
IBC Excerpts, showing relevant code sections
•
ADA Standards Excerpts, showing relevant sections from the ADA Standards for Accessible
Design
The building contains asbestos and lead in roof soffits, floor tiles, pipe insulation, and window paint.
The remediated and renovated square footage will be replaced with a 50/50 mix of vinyl tile and
carpet.
What is the total installed cost for the area of vinyl tile?
Question 2 of 35
Keep practicing
Take the free PROJECT-PLANNING-DESIGN practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other PROJECT-PLANNING-DESIGN practice questions
- Question 1Heavy steel columns and rigid connections between columns and beams Vertical steel trusse…
- Question 3An architect has just received client approval of the Schematic Design documents for a th…
- Question 4A proposed six-story commercial building will have a basement level with finished floor 2…
- Question 6A client asks that a lighting system be designed using the initial lamp lumen output. Whi…
- Question 7Which of the following is the most effective way to reduce noise in mechanical air delive…
- Question 9An architect has just received client approval of the Schematic Design documents for a th…