CSSLP practice question 34 of 35

In which of the following alternative processing sites is the backup facility maintained in a constant order, with a full complement of servers, workstations, and communication links ready to assume the primary operations responsibility?

Full set: 357 questions
Answer options
A: Cold Site
B: Hot Site Correct answer
C: Warm Site
D: Mobile Site
Correct Answer:
B. Hot Site
Explanation

A hot site is a disaster recovery facility that is a near-exact replica of the primary production environment. It is fully equipped with the necessary servers, workstations, networking equipment, and software. Data from the primary site is frequently replicated to the hot site, often in near real-time. This high state of readiness ensures that the organization can failover and resume critical operations with minimal to no downtime, making it "ready to assume the primary operations responsibility" almost immediately.

Why Incorrect

A. Cold Site: This is an empty facility with only basic infrastructure (power, cooling); it lacks any IT equipment and requires significant setup time.
C. Warm Site: This site has some hardware and connectivity but is not fully configured or updated, requiring hours or days for setup.
D. Mobile Site: This describes a transportable facility (e.g., a trailer), not its specific level of operational readiness, which could be hot, warm, or cold.

References

1. National Institute of Standards and Technology (NIST) Special Publication 800-34 Rev. 1, Contingency Planning Guide for Federal Information Systems. Section 4.3.2, "Alternate Site," page 39, defines a hot site as "a fully configured alternate processing site that is ready to be occupied and operated... A hot site is equipped with the necessary hardware, software, and telecommunications to begin processing, often within hours of a disaster."

2. Wilson, M., & Hash, J. (2003). Building an Information Technology Security Awareness and Training Program (NIST Special Publication 800-50). Section 4.4, "Contingency Planning/Disaster Recovery," page 23, describes a hot site as a "fully operational off-site data processing facility equipped with hardware and software, to be used in the event of a disaster."

3. Carnegie Mellon University, Software Engineering Institute (SEI). (2010). A Framework for Classifying and Comparing Architecture-Based Operational Resilience Methods (CMU/SEI-2010-TN-021). Section 3.2.2, "Recovery Strategies," page 13, discusses recovery sites, noting that hot sites provide the fastest recovery time objective (RTO) because they are fully equipped and synchronized.

Scroll to Top