CTS practice question 13 of 35
[Conducting a Needs Assessment]Which of the following is addressed within the Needs Analysis part of the AV Design process?
Full set: 254 questions[Conducting a Needs Assessment]
Which of the following is addressed within the Needs Analysis part of the AV Design process?
The Needs Analysis is the phase of the AV design process focused on understanding and documenting what the client wants the system to accomplish. Its primary output is a list of functional requirements, which describe the tasks and capabilities the end-users need from the AV system (e.g., "the ability to display a laptop on the main screen"). This analysis defines the "what" before the design phase determines the "how." It is the foundation upon which the entire system design, equipment selection, and project plan are built.
A. Creating the project timeline is a project management function that occurs after the initial scope is defined by the needs analysis.
B. Outlining the Bill of Materials (BOM) is part of the detailed design/engineering phase, where specific products are chosen to meet functional requirements.
C. Identifying key stakeholders is part of the project initiation process, which typically precedes the detailed needs analysis.
1. AVIXA. (2015). CTS-D Certified Technology Specialist-Design Exam Guide, Second Edition. McGraw-Hill. Chapter 2, "Conducting a Needs Assessment," pp. 21-23. (States the goal is to "determine the functional needs of the users" and create a "list of functional requirements").
2. AVIXA. (2020). AVIXA Standard 2M-2010, Standard Guide for Audiovisual Systems Design and Coordination Process. Section 4.2, "Programming Phase." (Describes this phase as the information-gathering stage to determine system requirements and user needs).
Keep practicing
Take the free CTS practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other CTS practice questions
- Question 1[Developing AV Solutions]Which method of control is supported by HDBaseT?
- Question 2[Conducting a Needs Assessment] During a site survey, a client states that there will be …
- Question 3[Developing AV Solutions] According to AVIXA Standards, what is the MINIMUM load rating f…
- Question 4[Developing AV Solutions] What key specification of an owner furnished credenza will a te…
- Question 7[Developing AV Solutions] In an audiovisual system where a touch panel is to be connected…
- Question 8[Developing AV Solutions]After there is an approved labor change to a project, what shoul…