CTS practice question 15 of 35
[Developing AV Solutions] Installing an AV system generates a lot of debris. When is the BEST time to identify if there will be a place to dispose of the debris?
Full set: 254 questionsThe initial site survey is the designated project phase for gathering all critical information about the physical environment. This includes logistical considerations such as site access, equipment staging areas, and arrangements for waste and debris disposal. Identifying the location for debris disposal at this early stage prevents delays, unexpected costs, and logistical problems once installation begins. It is a key part of proactive project planning and site readiness assessment.
A. Before training is too late; installation is complete by this point, and all debris should have already been managed and removed.
C. Before control system programming is also too late, as programming can occur concurrently with or after the main physical installation work.
D. During the first day of the installation is a reactive approach that can lead to project delays and reflects poor planning.
1. AVIXA. (2019). CTS Certified Technology Specialist Exam Guide, Third Edition. McGraw-Hill. Chapter 3, "Conducting a Site Survey," p. 80. (Specifies that the survey should document logistical factors, including "Where will the AV team stage equipment and dispose of trash?").
2. ANSI/AVIXA A102.01:2017. (2017). Audiovisual Systems Design and Coordination Components. Section 3.2, "Program Phase," (Implies that site conditions and constraints, which include logistics like waste disposal, are identified early in the project lifecycle).
Keep practicing
Take the free CTS practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other CTS practice questions
- Question 1[Developing AV Solutions]Which method of control is supported by HDBaseT?
- Question 2[Conducting a Needs Assessment] During a site survey, a client states that there will be …
- Question 3[Developing AV Solutions] According to AVIXA Standards, what is the MINIMUM load rating f…
- Question 4[Developing AV Solutions] What key specification of an owner furnished credenza will a te…
- Question 7[Developing AV Solutions] In an audiovisual system where a touch panel is to be connected…
- Question 8[Developing AV Solutions]After there is an approved labor change to a project, what shoul…