LEED-AP-BDC practice question 16 of 35
Increasing which of the following variables will require an increase in the outdoor airflow rate under Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?
Full set: 305 questionsThe LEED IEQ Prerequisite, Minimum Indoor Air Quality Performance, requires projects to meet the minimum ventilation rates prescribed by ASHRAE Standard 62.1-2010. The standard's Ventilation Rate Procedure calculates the required outdoor airflow based on both the area of the space and the number of occupants. The breathing zone outdoor airflow (Vbz) is determined by the formula Vbz = Rp Pz + Ra Az, where Pz is the zone population. Therefore, an increase in the number of occupants (Pz) directly increases the required outdoor airflow rate.
A. Supply air velocity is related to air distribution effectiveness and thermal comfort, not the calculation of the required quantity of outdoor air.
C. Increasing system ventilation efficiency (Ev) would decrease the required outdoor air intake at the system level for a given breathing zone requirement.
D. The supply air temperature set point is a parameter for thermal comfort and energy management, not for determining minimum ventilation rates for air quality.
1. ASHRAE Standard 62.1-2010, Ventilation for Acceptable Indoor Air Quality, Section 6.2, "Ventilation Rate Procedure." The formula Vbz = RpPz + RaAz explicitly shows that the zone population (Pz) is a direct variable.
2. USGBC. (2014). LEED v4 for Building Design and Construction. Washington, DC: U.S. Green Building Council. Page 478. The guide states projects must meet the minimum outdoor air intake flow rates using the ventilation rate procedure from ASHRAE 62.1-2010.
Keep practicing
Take the free LEED-AP-BDC practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other LEED-AP-BDC practice questions
- Question 1When required to measure residential and non-residential densities, Location and Transpor…
- Question 2A design team is working on a hospital project. In order to meet the Energy and Atmospher…
- Question 3For Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan,…
- Question 4What LEED Building Design and Construction rating system mandates a preliminary LEED meet…
- Question 5Which of the following strategies would be considered an acceptable minor improvement wit…
- Question 6Which of the following sinks is classified as a private lavatory faucet under Water Effic…