LEED-AP-BDC practice question 8 of 35
Which of the following statements is correct when defining the project boundary?
Full set: 305 questionsThe LEED project boundary is the portion of the project site submitted for LEED certification. A core rule for defining this boundary is that it must encompass the land and water bodies associated with the project's typical, normal operations. This ensures that the environmental impacts being assessed are directly related to the building and its functional use. The boundary includes all areas disturbed for construction, as well as features like parking, septic systems, and stormwater treatment that support the project, even if they are not physically contiguous with the main building site.
A. The LEED project boundary can include non-contiguous parcels of land if they are related to the project's normal operations.
B. A single LEED project can include multiple buildings, such as in a campus or multi-building development application.
D. The Minimum Program Requirement (MPR) states the gross floor area must be no less than 2% of the gross land area, not 1%.
1. U.S. Green Building Council. (2014). LEED v4 for Building Design and Construction Reference Guide. Washington, DC: U.S. Green Building Council. p. 26, "Getting Started: Minimum Program Requirements, MPR #3: Must comply with project size requirements."
2. U.S. Green Building Council. (2020). LEED v4.1 Building Design and Construction Reference Guide. Washington, DC: U.S. Green Building Council. "Getting Started: LEED Project Boundary."
Keep practicing
Take the free LEED-AP-BDC practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other LEED-AP-BDC practice questions
- Question 1When required to measure residential and non-residential densities, Location and Transpor…
- Question 2A design team is working on a hospital project. In order to meet the Energy and Atmospher…
- Question 3For Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan,…
- Question 4What LEED Building Design and Construction rating system mandates a preliminary LEED meet…
- Question 5Which of the following strategies would be considered an acceptable minor improvement wit…
- Question 6Which of the following sinks is classified as a private lavatory faucet under Water Effic…