LEED-AP-IDC practice question 12 of 35
A project incorporates steel beams as an interior architectural feature, but no recycled content information is available. When calculating the recycled content of the beams, which default content amount should be used?
Full set: 100 questionsLEED 2009 (used for the ID+C professional exam) allows default “industry-average” recycled-content values when a product-specific declaration is unavailable. The LEED Commercial Interiors Reference Guide lists structural steel (rebar, plate, and shapes) at 25 % post-consumer recycled content and 0 % pre-consumer. Therefore, when no manufacturer data are provided, project teams must enter 25 % recycled content for the steel beams in Materials & Resources credit calculations.
A. 10 % Not the LEED default; underestimates the industry average and would shortchange credit achievement.
B. 15 % No LEED table assigns 15 % to any steel product; unsupported default.
C. 20 % Applies to aluminum in the same table, not to steel.
1. USGBC. LEED 2009 for Commercial Interiors Reference Guide, MR Credit 4: Recycled Content, Table “Default Recycled Content Values,” p. 302 (steel = 25 % post-consumer).
2. USGBC. LEED 2009 for New Construction & Major Renovations Reference Guide, MRc4 table, p. 357 (identical 25 % value).
3. American Institute of Steel Construction. “Sustainability of Structural Steel,” 2010, p. 3 (avg. U.S. structural steel = 25–30 % post-consumer scrap).
4. J. Yoon et al., Journal of Constructional Steel Research 70(4), 2012, 396-404, doi:10.1016/j.jcsr.2011.11.009 (reports typical recycled content ≥25 % for U.S. structural steel).
Keep practicing
Take the free LEED-AP-IDC practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other LEED-AP-IDC practice questions
- Question 1A mechanical engineer needs to identify spaces that are considered densely occupied accor…
- Question 2A renovation project includes both a new kitchen sink and shower and an existing lavatory…
- Question 3A project team wants to achieve Materials and Resources Credit, Building Product Disclosu…
- Question 4To satisfy the Increased Ventilation strategy in the Indoor Environmental Quality Credit,…
- Question 5A tenant implements the following strategies to reduce the amount of water used. Which st…
- Question 7What should a team focus on first to significantly improve energy performance or achieve …