LEED-AP-IDC practice question 9 of 35
According to the Integrative Process Credit, Integrative Process the discovery phase of site selection for an existing building should identify
Full set: 100 questionsIn LEED v4/v4.1 ID+C, the Integrative Process credit requires a “discovery” study before design begins. For existing‐building interiors, the discovery phase must examine “site selection” factors, which USGBC defines as identifying the transportation and connectivity characteristics of the site (mass transit, bicycle networks, walkability, parking supply, etc.). Lighting levels, operational schedules and thermal comfort are evaluated later under energy-related or indoor environmental quality analyses, not under “site selection.” Therefore, transportation options is the only item the credit explicitly requires the project team to identify at this stage.
A. Lighting levels – Addressed in energy modelling and Interior Lighting credits, not in the site-selection portion of the discovery phase.
B. Operational schedules – Part of energy analysis assumptions, unrelated to site characteristics.
D. Thermal comfort ranges – Evaluated under ASHRAE 55 and EQ credits, not in site selection.
1. U.S. Green Building Council. “LEED v4 for Interior Design and Construction Reference Guide,” Integrative Process credit, Section ‘Discovery – Site Selection (Existing Buildings)’, pp. 56-57 (2014).
2. U.S. Green Building Council. “LEED v4.1 ID+C Rating System,” Integrative Process credit, Requirements bullet 3: “Identify transportation and parking opportunities,” p. 11 (2020).
3. MIT OpenCourseWare, 11.301J “Introduction to Urban Transportation Planning,” Lecture 2 notes (context for evaluating multimodal site transportation in sustainable design).
Keep practicing
Take the free LEED-AP-IDC practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other LEED-AP-IDC practice questions
- Question 1A mechanical engineer needs to identify spaces that are considered densely occupied accor…
- Question 2A renovation project includes both a new kitchen sink and shower and an existing lavatory…
- Question 3A project team wants to achieve Materials and Resources Credit, Building Product Disclosu…
- Question 4To satisfy the Increased Ventilation strategy in the Indoor Environmental Quality Credit,…
- Question 5A tenant implements the following strategies to reduce the amount of water used. Which st…
- Question 7What should a team focus on first to significantly improve energy performance or achieve …