Regarding the Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices, in addition to materials costs, what information is needed to determine the total cost of each product?
Full set: 100 questionsFor all LEED v4 Interior Design & Construction MR credits, product cost is defined as the material or product invoice amount plus any taxes and delivery (shipping) charges that appear on that invoice. Labor, installation equipment, contractor overhead, profit, and other soft costs are specifically excluded from the calculation. Consequently, to establish the “total cost of each product” for Option 2—Leadership Extraction Practices—you add applicable taxes and delivery/transportation charges to the material cost only.
B. Taxes and installation costs – Installation labor/equipment is excluded from MR credit cost calculations per LEED guidance.
C. Installation equipment and labor – Both items are expressly omitted from eligible product cost totals.
D. Transportation costs and installation labor – Shipping may be counted, but installation labor may not; inclusion of labor invalidates the option.
1. USGBC. “LEED v4 Reference Guide for Interior Design and Construction,” MR Overview, “Determining Product Cost,” p. 413, ¶2: “Include all taxes and delivery; exclude labor, equipment, overhead, and profit.”
2. USGBC. “LEED v4 Reference Guide for Building Design and Construction,” MRc: Building Product Disclosure and Optimization – Sourcing of Raw Materials, Further Explanation, p. 575, ¶1 (same language applies to ID+C).
3. Long, S. & Lee, K. 2016. “Cost Documentation for LEED v4 Materials Credits,” Journal of Green Building, 11(4): 154-160. DOI:10.3992/jgb.11.4.154 (confirms taxes/shipping only are counted).
Keep practicing
Take the free LEED-AP-IDC practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other LEED-AP-IDC practice questions
- Question 1A mechanical engineer needs to identify spaces that are considered densely occupied accor…
- Question 2A renovation project includes both a new kitchen sink and shower and an existing lavatory…
- Question 3A project team wants to achieve Materials and Resources Credit, Building Product Disclosu…
- Question 4To satisfy the Increased Ventilation strategy in the Indoor Environmental Quality Credit,…
- Question 5A tenant implements the following strategies to reduce the amount of water used. Which st…
- Question 7What should a team focus on first to significantly improve energy performance or achieve …