Which is a minimum requirement for applying the 'change' theme?
Full set: 478 questionsThe PRINCE2 methodology specifies minimum requirements for applying each theme to ensure a project is genuinely being managed using PRINCE2. For the 'change' theme, one of these minimum requirements is to define the project's approach to issue management. This definition must include establishing an issue management procedure and specifying the format and contents of the issue register. This ensures that all issues are captured, assessed, and managed in a consistent and controlled manner throughout the project lifecycle.
A. Protecting products is part of configuration management, but the minimum requirement is to define the approach, not specify every detail within it.
C. Producing issue reports is an activity within the defined procedure, but the minimum requirement is to define the procedure itself, not mandate every output.
D. Delegating change authority is an option that can be configured within the change control approach; it is not a mandatory minimum requirement.
AXELOS. (2023). Managing Successful Projects with PRINCE2 (7th ed.). TSO (The Stationery Office). Chapter 12, Section 12.2, p. 136.
Keep practicing
Take the free PRINCE2-FOUNDATION practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other PRINCE2-FOUNDATION practice questions
- Question 1How should effective issue management be applied When changing management products?
- Question 2Which is one of the six aspects of project performance to be managed?
- Question 3Which is a benefit of using PRINCE2?
- Question 4Which is an assumption about the PRINCE2 customer/supplier environment?
- Question 5What is an advantage of applying the 'manage by stages' principle?
- Question 6Which is a minimum requirement for applying the quality theme?