Who must change the Work in Progress (WIP) Limits in the Definition of Workflow when urgent work emerges from the Sprint? (choose the best answer)

Full set: 73 questions
Answer options
A: The Developers.
B: The Product Owner.
C: The Scrum Master.
D: No one. Urgent work is not a reason to change WIP Limits. Correct answer
E: No one. WIP Limits cannot be modified during a Sprint.
Correct Answer:
D. No one. Urgent work is not a reason to change WIP Limits.
Explanation

In Professional Scrum with Kanban, the Work in Progress (WIP) limits are set as a policy to maintain a sustainable flow of work. Urgent work emerging does not automatically warrant changing these WIP limits; instead, the team should first discuss how to accommodate the urgent work within the existing constraints. Modifying WIP limits for urgent work could undermine the benefits of a controlled flow, which is why urgent work should not be a reason to change WIP limits during a Sprint