1Z0-1129 practice question 3 of 10
What two steps are required to create a baseline in Primavera P6?
Full set: 429 questionsTo create a baseline in Primavera P6, one must first open the project exclusively (A) to prevent access conflicts. Then, the project manager selects Project > Maintain Baselines (B) to set the baseline. Finally, assigning the baseline to the project (D) makes it the reference for tracking progress.
A. Opening the project exclusively is not a mandatory step for creating a baseline; it primarily helps avoid conflicts.
C. Defining baseline start and finish dates is not necessary; the selecting and assigning steps cover this.
- Primavera P6 User Guide, Oracle. (2021). Project Management Features, pp. 79-81.
- Primavera P6 Fundamentals Training Manual, Oracle. (2020). Baseline Creation, pp. 23-25.
- Primavera P6 Documentation, Oracle. (2022). User Preferences and Baselines, §4.3.
Keep practicing
Take the free 1Z0-1129 practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other 1Z0-1129 practice questions
- Question 1How can labor units be updated for tasks in Primavera P6?
- Question 2What is the purpose of tracking utilization percentages in the Analysis Page?
- Question 4What two features does the Maintain Baselines tool offer?
- Question 5What two factors determine the choice of calendar for an activity?
- Question 6What is the purpose of drag-and-drop functionality in the WBS tab?
- Question 7What two actions are possible when using the drag-and-drop functionality in the WBS tab?