Which of the following should a project team take into consideration during the discovery phase of site selection to earn Integrative Process Credit?
Full set: 100 questionsDuring the discovery phase for IP Credit, teams must evaluate how site-selection decisions interact with preliminary energy analyses. The LEED v4 BD+C Reference Guide (IPc1) lists the required factors for energy modelling: site conditions (including transportation access), basic building features (massing, orientation), basic envelope attributes, and lighting levels. Considering these parameters early allows the team to uncover synergies and optimise energy performance before a site is chosen. Option C aligns with all four required categories; the other options omit key mandatory factors.
A. Includes only two of the required energy factors; omits site/transportation, envelope and lighting.
B. Addresses programmatic and scheduling issues but ignores lighting, envelope, and transportation site factors required in discovery.
D. “Occupant well-being” is not part of the LEED-mandated discovery analysis for IP credit; lighting and envelope, which are required, are missing.
1. U.S. Green Building Council. LEED v4 BD+C Reference Guide, IP Credit: Integrative Process, “Discovery – Energy-Related Systems,” bullets 1-4, p. 84–85 (2013).
2. U.S. Green Building Council. LEED v4 BD+C Reference Guide, IP Credit: Integrative Process, “Site-Selection Considerations,” p. 82 (2013).
3. Clark, R. & Paoletti, K. “Early-Stage Integrative Energy Modeling for LEED Projects,” Journal of Green Building, 11(2): 123-134, 2016. DOI:10.3992/1943-4618.11.2.123 (confirms need to analyse lighting, envelope and transportation in discovery).
4. Stanford University. CEE 176A/276A – “Energy Efficient Building Design,” Lecture 3 slides, “Integrative Design Workflow,” pp. 5-6 (2019) – lists transportation access, envelope, and lighting as discovery inputs.
Keep practicing
Take the free LEED-AP-IDC practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other LEED-AP-IDC practice questions
- Question 1A mechanical engineer needs to identify spaces that are considered densely occupied accor…
- Question 2A renovation project includes both a new kitchen sink and shower and an existing lavatory…
- Question 3A project team wants to achieve Materials and Resources Credit, Building Product Disclosu…
- Question 4To satisfy the Increased Ventilation strategy in the Indoor Environmental Quality Credit,…
- Question 5A tenant implements the following strategies to reduce the amount of water used. Which st…
- Question 7What should a team focus on first to significantly improve energy performance or achieve …