CWDP-305 practice question 34 of 35

What are the deliverables to your customer after successfully implementing a WLAN infrastructure?

Full set: 341 questions

Domain Design Deployment and Validation

Answer options
A: Digital or physical assets, guides, floorplans and configuration documents Correct answer
B: Project Charter
C: Facility blueprints
D: Nothing is required. The implemented WLAN was deliverable
Correct Answer:
A. Digital or physical assets, guides, floorplans and configuration documents
Explanation

Upon the successful implementation of a WLAN infrastructure, the project concludes with a formal handover to the customer. This process involves delivering a comprehensive package of documentation and assets that enable the customer's IT and operations teams to manage, maintain, and troubleshoot the new network effectively. These deliverables, often referred to as "as-built" documentation, typically include updated floorplans showing final AP placements and RF coverage, detailed configuration documents for all network components (controllers, APs, switches, RADIUS), and operational guides. This documentation is a critical deliverable that ensures the long-term success and supportability of the implemented solution.

Why Incorrect

B. The Project Charter is a foundational document created at the beginning of a project to define its scope and authorize its existence, not a deliverable after completion.
C. Facility blueprints are typically provided by the customer as an input for the design phase, not delivered to them as a final product of the WLAN project.
D. The functional WLAN is the primary outcome, but failing to provide documentation leaves the customer without the necessary tools and information for ongoing network operations and management. ---

References

1. Coleman, D. D., Westcott, D. A., & Harkins, S. (2021). CWDP-304 Certified Wireless Design Professional Official Study Guide. Sybex. In Chapter 1, "The WLAN Design Process," the "Documentation" section emphasizes that after deployment and validation, comprehensive documentation is a key deliverable. This includes network diagrams, floorplans with AP locations, device configurations, and security policies, which are essential for the customer.

2. Oppenheimer, P. (2010). Top-Down Network Design (3rd ed.). Cisco Press. Chapter 1, "Analyzing Business Goals and Constraints," outlines the network lifecycle. The final stages of the implementation phase involve creating and delivering "as-built" documentation to the customer, which is crucial for the network's operational phase.

3. Carnegie Mellon University, Information Technology Project Management Framework. The "Closing" phase of the project lifecycle explicitly lists "Final Project Deliverables" and "Documentation" as required outputs. This includes turning over all project artifacts, such as system documentation, configuration guides, and training materials, to the operational owner. This is a standard practice in formal IT project management.