300-425 practice question 17 of 25
Based on a wireless network design, an engineer configured a primary and secondary controller for their APs. A power interruption caused the primary…
Choose your answer, then check it against the explanation.
Based on a wireless network design, an engineer configured a primary and secondary controller for
their APs. A power interruption caused the primary Cisco WLC to go down, and, as expected, all APs
joined the secondary controller. When the primary controller came back up, all the
APs remained joined to the secondary controller. Which approach must the engineer take for the APs
to move back to the primary?
Question 17 of 25
Keep practicing
Take the free 300-425 practice test
Ten exam-style questions with answers and explanations, plus the exam facts and study guides.
More questions
Other 300-425 practice questions
- Question 2A wireless consultant reviewing the installation of an old wireless network. The existing…
- Question 3A company is in the process of relocating to a new force space and ends out that the Inte…
- Question 4An engineer must deploy a wireless network in an open-plan environment that has three SSI…
- Question 5A hospital wireless environment was designed with these characteristics: • RF coverage • …
- Question 6A customer has this wireless design: • two Cisco Catalyst 9800 Series wireless controller…
- Question 7An engineer is implementing a wireless design for a service provider. The design includes…